Block and beam nearly complete.
Category Archives: Uncategorized
Footings poured
Footing poured and ready.
Footing signed off
Building control have been and signed off the footings.
Footings
Level site
Retaining wall 2 up
Second retaining wall up.
Retaining wall 1 capped with engineering’s.
Retaining wall 2 footing dug out
One retaining wall just ready for engineering top course
Another day a bit more retaining wall.
Thanks to Ian from next door we have this lovely aerial shot of the site from today.