Block & Beam

Block and beam nearly complete.

Posted byadminMay 7, 2021May 7, 2021Posted inUncategorized

Footings poured

Footing poured and ready.

Posted byadminMay 4, 2021May 4, 2021Posted inUncategorized

Footing signed off

Building control have been and signed off the footings.

Posted byadminApril 30, 2021April 30, 2021Posted inUncategorized

Footings

Posted byadminApril 28, 2021Posted inUncategorized

Level site

Posted byadminApril 27, 2021April 27, 2021Posted inUncategorized

Retaining wall 2 up

Second retaining wall up.

Posted byadminApril 23, 2021April 24, 2021Posted inUncategorized

Retaining wall 1 capped with engineering’s.

Posted byadminApril 23, 2021April 24, 2021Posted inUncategorized

Retaining wall 2 footing dug out

Posted byadminApril 14, 2021April 14, 2021Posted inUncategorized

One retaining wall just ready for engineering top course

Posted byadminMarch 29, 2021Posted inUncategorized

Another day a bit more retaining wall.

Thanks to Ian from next door we have this lovely aerial shot of the site from today.

Posted byadminMarch 24, 2021Posted inUncategorized

Posts pagination

Newer posts 1 2 3 4 5 Older posts

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in

Archives

  • October 2022
  • September 2022
  • July 2022
  • June 2022
  • May 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021

Categories

  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Bideford Green 309a, Proudly powered by WordPress.