Skip to content

Bideford Green 309a

Property Development

One retaining wall just ready for engineering top course

Posted byadmin March 29, 2021
Posted byadminMarch 29, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Another day a bit more retaining wall.
Next Post Next post:
Retaining wall 2 footing dug out

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.