Skip to content

Bideford Green 309a

Property Development

Footings poured

Posted byadmin May 4, 2021May 4, 2021

Footing poured and ready.

Posted byadminMay 4, 2021May 4, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Footing signed off
Next Post Next post:
Block & Beam

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.