Skip to content

Bideford Green 309a

Property Development

Retaining wall 2 up

Posted byadmin April 23, 2021April 24, 2021

Second retaining wall up.

Posted byadminApril 23, 2021April 24, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Retaining wall 1 capped with engineering’s.
Next Post Next post:
Level site

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.