Skip to content

Bideford Green 309a

Property Development

Block & Beam

Posted byadmin May 7, 2021May 7, 2021

Block and beam nearly complete.

Posted byadminMay 7, 2021May 7, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Footings poured
Next Post Next post:
Water supply connected

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.