Skip to content

Bideford Green 309a

Property Development

Footing signed off

Posted byadmin April 30, 2021April 30, 2021

Building control have been and signed off the footings.

Posted byadminApril 30, 2021April 30, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Footings
Next Post Next post:
Footings poured

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.