Skip to content

Bideford Green 309a

Property Development

Retaining wall 2 footing dug out

Posted byadmin April 14, 2021April 14, 2021
Posted byadminApril 14, 2021April 14, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
One retaining wall just ready for engineering top course
Next Post Next post:
Retaining wall 1 capped with engineering’s.

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.