Skip to content

Bideford Green 309a

Property Development

Skylights in and sealed

Posted byadminJune 16, 2022June 16, 2022Posted inUncategorized

Electric duct ready for connection.

Duct and meter box installed ready for electric connection

Posted byadminJune 9, 2022June 9, 2022Posted inUncategorized

Ready for gas connection

Tench dug and has box fitted ready for gas connection on Monday.

Posted byadminMay 26, 2022May 26, 2022Posted inUncategorized

Site cleanup

Before

After

Posted byadminMay 18, 2022May 18, 2022Posted inUncategorized

Scaffold down

Posted byadminMay 18, 2022May 18, 2022Posted inUncategorized

Screed done.

Screeding down and done.

Posted byadminMarch 23, 2022March 23, 2022Posted inUncategorized

Undefloor heating

Undefloor heating pipes in and pressure ready for screed.

Posted byadminFebruary 17, 2022February 17, 2022Posted inUncategorized

More bricks

Brick delivery ahead of Monday.

Posted byadminJanuary 22, 2022January 22, 2022Posted inUncategorized

Ridges on

Posted byadminJanuary 14, 2022January 15, 2022Posted inUncategorized

Tiles going on and brickwork going up.

Posted byadminJanuary 12, 2022Posted inUncategorized

Posts pagination

Newer posts 1 2 3 4 5 Older posts

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.