Skip to content

Bideford Green 309a

Property Development

Ready for gas connection

Posted byadmin May 26, 2022May 26, 2022

Tench dug and has box fitted ready for gas connection on Monday.

Posted byadminMay 26, 2022May 26, 2022Posted inUncategorized

Post navigation

Previous Post Previous post:
Site cleanup
Next Post Next post:
Electric duct ready for connection.

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.