Skip to content

Bideford Green 309a

Property Development

Electric duct ready for connection.

Posted byadmin June 9, 2022June 9, 2022

Duct and meter box installed ready for electric connection

Posted byadminJune 9, 2022June 9, 2022Posted inUncategorized

Post navigation

Previous Post Previous post:
Ready for gas connection
Next Post Next post:
Skylights in and sealed

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.