Skip to content

Bideford Green 309a

Property Development

Skylights in and sealed

Posted byadmin June 16, 2022June 16, 2022
Posted byadminJune 16, 2022June 16, 2022Posted inUncategorized

Post navigation

Previous Post Previous post:
Electric duct ready for connection.
Next Post Next post:
Sewer connections and rain water downpipes connected

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.