Skip to content

Bideford Green 309a

Property Development

Site cleanup

Posted byadmin May 18, 2022May 18, 2022

Before

After

Posted byadminMay 18, 2022May 18, 2022Posted inUncategorized

Post navigation

Previous Post Previous post:
Scaffold down
Next Post Next post:
Ready for gas connection

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.