Skip to content

Bideford Green 309a

Property Development

Sewer connections and rain water downpipes connected

Posted byadmin June 23, 2022June 23, 2022
Posted byadminJune 23, 2022June 23, 2022Posted inUncategorized

Post navigation

Previous Post Previous post:
Skylights in and sealed
Next Post Next post:
More walls

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.