Skip to content

Bideford Green 309a

Property Development

Water supply connected

Posted byadmin June 4, 2021June 4, 2021

Anglian water have now connected the water supply following a short delay from the original install date.

Posted byadminJune 4, 2021June 4, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Block & Beam
Next Post Next post:
Drainage

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.