Skip to content

Bideford Green 309a

Property Development

Category Archives: Uncategorized

Brickwork begins

Posted byadminJanuary 10, 2022Posted inUncategorized

Roofing battens on

Tiles ready to go up the bumpa to the roof.

Posted byadminJanuary 10, 2022January 10, 2022Posted inUncategorized

Timber frame going up.

Posted byadminDecember 13, 2021December 14, 2021Posted inUncategorized

Block and beam ready for timber frame

Posted byadminNovember 30, 2021Posted inUncategorized

Revised Footings dug

Posted byadminNovember 10, 2021November 10, 2021Posted inUncategorized

Sewer reroute concreted and stoned

Posted byadminNovember 4, 2021November 4, 2021Posted inUncategorized

Sewer re routed

Sewer now re routed around the house rather than under it.

Posted byadminOctober 1, 2021October 1, 2021Posted inUncategorized

Sewer Diversion Dug

Sewer diversion trenches dug.

Posted byadminSeptember 21, 2021Posted inUncategorized

Drainage

Surface water reroute digging started today while waiting for delivery.

Posted byadminSeptember 15, 2021September 15, 2021Posted inUncategorized

Water supply connected

Anglian water have now connected the water supply following a short delay from the original install date.

Posted byadminJune 4, 2021June 4, 2021Posted inUncategorized

Posts pagination

Newer posts 1 2 3 4 5 Older posts

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.