Skip to content

Bideford Green 309a

Property Development

Block and beam ready for timber frame

Posted byadmin November 30, 2021
Posted byadminNovember 30, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Revised Footings dug
Next Post Next post:
Timber frame going up.

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.