Skip to content

Bideford Green 309a

Property Development

Sewer Diversion Dug

Posted byadmin September 21, 2021

Sewer diversion trenches dug.

Posted byadminSeptember 21, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Drainage
Next Post Next post:
Sewer re routed

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.