Here goes the first bricks onsite.
Category Archives: Uncategorized
Water connection application
Water connection application completed with Anglian Water.
Retaining wall footing poured
Footing poured this afternoon.
Retaining wall number 1
Retaining wall 1 footing dug and pegged ready for concrete.
Site safe and secure.
Another day on the mammoth stump
Stumps out except for a hidden “big one”
Hedge stripped and chipped
Hedge stripped and chipped ready for trunks to be pulled out.
Planning Permission Granted
Planning permission granted for 309A Bideford Green.