Skip to content

Bideford Green 309a

Property Development

Category Archives: Uncategorized

Retaining wall going up

Here goes the first bricks onsite.

Posted byadminMarch 22, 2021March 22, 2021Posted inUncategorized

Water connection application

Water connection application completed with Anglian Water.

Posted byadminMarch 16, 2021Posted inUncategorized

Retaining wall footing poured

Footing poured this afternoon.

Posted byadminMarch 12, 2021Posted inUncategorized

Retaining wall number 1

Retaining wall 1 footing dug and pegged ready for concrete.

Posted byadminMarch 4, 2021March 4, 2021Posted inUncategorized

Site safe and secure.

Posted byadminFebruary 19, 2021Posted inUncategorized

Another day on the mammoth stump

Posted byadminFebruary 18, 2021Posted inUncategorized

Stumps out except for a hidden “big one”

Posted byadminFebruary 11, 2021Posted inUncategorized

Hedge stripped and chipped

Hedge stripped and chipped ready for trunks to be pulled out.

Posted byadminFebruary 4, 2021February 4, 2021Posted inUncategorized

Planning Permission Granted

Planning permission granted for 309A Bideford Green.

Posted byadminJanuary 11, 2021January 28, 2021Posted inUncategorized

Posts pagination

Newer posts 1 … 3 4 5

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.