Skip to content

Bideford Green 309a

Property Development

Retaining wall footing poured

Posted byadmin March 12, 2021

Footing poured this afternoon.

Posted byadminMarch 12, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Retaining wall number 1
Next Post Next post:
Water connection application

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.