Skip to content

Bideford Green 309a

Property Development

Stumps out except for a hidden “big one”

Posted byadmin February 11, 2021
Ready for the off.
Tom taking out a stump.
Loads more path now.
The big one! We’re coming back for this one.
Posted byadminFebruary 11, 2021Posted inUncategorized

Post navigation

Previous Post Previous post:
Hedge stripped and chipped
Next Post Next post:
Another day on the mammoth stump

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.