Bideford Green 309a

Property Development

Boiler coming along

Posted byadminOctober 19, 2022October 20, 2025Posted inUncategorized

En-suite started

Posted byadminOctober 19, 2022October 19, 2022Posted inUncategorized

Skirting getting painted

Skirting first coat of paint.

Posted byadminOctober 18, 2022October 18, 2022Posted inUncategorized

Front drainage installed

Edge and driveway drainage installed.

Posted byadminOctober 14, 2022October 14, 2022Posted inUncategorized

Boiler going in

Boiler one the wall and plumbing started.

Posted byadminOctober 12, 2022October 14, 2022Posted inUncategorized

Fencing one side complete.

Posted byadminSeptember 8, 2022September 8, 2022Posted inUncategorized

Walls & insulation

Walls heading up and insulation going in.

Posted byadminJuly 13, 2022July 13, 2022Posted inUncategorized

Walls going up

Posted byadminJuly 12, 2022July 12, 2022Posted inUncategorized

More walls

Garden walls.

Posted byadminJuly 11, 2022July 11, 2022Posted inUncategorized

Sewer connections and rain water downpipes connected

Posted byadminJune 23, 2022June 23, 2022Posted inUncategorized

Posts pagination

1 2 3 … 5 Older posts

Recent Posts

  • Boiler coming along
  • En-suite started
  • Skirting getting painted
  • Front drainage installed
  • Boiler going in
Bideford Green 309a, Proudly powered by WordPress.